Where does
slowing begin?
I identify the first point at which drivers brake, rather than relying on the visible end of a queue.
SHENZHEN / ROAD RESEARCH /
01 / THE STARTING POINT
I began by watching the road from inside a vehicle.
Roads connect residential neighbourhoods, workplaces and other parts of a city, making it easier for people to get around. Yet I kept wondering why congestion returned to the same places. I began watching where traffic converged, where people were heading and where queues started to form.
Daily commutes in Beijing gave me a sense of the city's scale. Ring roads stretched outwards, while residential neighbourhoods, office districts, schools and industrial areas often felt like separate clusters. Each area could be busy, yet the distances between them were long. As people left for work and school at the same time, many of their routes converged on the same stretches of road. Sitting in those queues, I wondered how much of the congestion came from the city's pattern of land use.
In Shanghai, I noticed a different arrangement. Housing and commerce were more closely mixed, and elevated roads offered quick routes across large parts of the city. I also travelled along older roads that seemed narrow for the volume of traffic using them. Their designers, working decades earlier, could hardly have anticipated today's demand. During peak hours, I watched where lanes narrowed, where exit ramps began and how early drivers started changing lanes and pushing into gaps.
In Hong Kong, a short one-way street showed me how much a single turn could change a journey. The layout might reduce conflict at a narrow junction while sending other drivers on a detour. I began to think more carefully about the routes drivers could choose before reaching an entrance or exit.
I later came to Shenzhen. From the pavement, some main roads looked wide. From inside a car during rush hour, I saw how one lane slowing down could fill the neighbouring lanes and bring traffic across the road almost to a standstill. I wanted to understand why such wide roads could leave everyone waiting.
At an exit ramp, for example, a queue may begin in the right-hand lane. Drivers approaching in the left-hand lanes may need to cross several lanes to reach the exit. As they slow down and look for gaps, they can hold up other vehicles, spreading congestion beyond the exit lane. I want to trace this chain of events back to its source and check whether the same pattern occurs at the other sites I have selected.
I chose four junctions and road connections with these problems. At each site, I investigate where congestion begins, develop possible improvements and consider the difficulties of carrying out construction while keeping the road open. Drawing up an appealing proposal is a starting point; I need to assess whether the improvements would justify the space required, the disruption during construction and the cost.
Five cities. One question.
02 / FOUR STUDY SITES
I follow an entrance, an exit and two urban road connections to understand where movement breaks down.
OPENING FILM / 22 SECONDS
03 / FIELD OBSERVATIONS
At each location, I looked for the sequence behind a delay.
I went to Shenzhen to observe how vehicles approach the selected junctions and connecting roads, where they first slow, and how queues affect neighbouring lanes.
I watched the movement that introduces a conflict, the drivers who must brake or change lanes, and the point from which a queue begins to extend upstream. These observations shaped the questions I later examined in the model.
I identify the first point at which drivers brake, rather than relying on the visible end of a queue.
I watch vehicles entering, leaving and crossing lanes at each connection.
I look for queues that reach adjacent lanes, entrances or junctions.
04 / TRAFFIC DYNAMICS
I begin with the original conditions before any intervention.
I sample traffic at four different points in time, one within each of the periods 07:00–07:30, 07:30–08:30, 08:30–09:30 and 09:30–10:00. The four simulation samples last five, fifteen, fifteen and five minutes respectively. Together, these forty minutes of simulation let me observe vehicle movements alongside the corresponding charts. Replay and skip controls let me inspect the sequence at different moments.
I use the sequence to identify when traffic converges, how a bottleneck causes speeds to fall, and how the queue propagates upstream.
The animated vehicles and numerical values are part of a research simulation. I use them to illustrate a plausible pattern of traffic change; I do not present them as observations of every individual vehicle on the road.
06 / SPATIAL STUDIES
I use four 3D studies to observe existing conditions and proposed changes.
I observe cameras and curbside stopping along the Wanda frontage in Bao’an. At Liuxian, I test a below-grade through route. The slider reveals each proposal in place.
The Bao’an camera scene studies the Wanda frontage, separate from the Yu’an 1st Road junction film; it does not place cameras at that junction. At Beihuan Avenue, the elevated form illustrates a difference in road levels, while the road itself is not a viaduct. All geometry and equipment locations require site verification.
07 / SHARED STREET MEASURES
I consider changes that could address recurring points of friction across the four locations.
I would test dynamic queue warnings upstream of constrained exits, provided reliable detection can identify the queue early enough for drivers to respond. The numbers on this illustrative display are examples, not measurements from a study site.
On the Shenzhen streets I have observed, dedicated cycle space is often limited while many people travel on foot, by bicycle or by electric two-wheeler. Where the width allows, I would allocate a continuous protected lane so these journeys have a clear route, while preserving footways, crossings and access to buildings.
With so many people using the road edge, parked two-wheelers can take up the space needed for walking and cycling. I would observe where they accumulate, provide designated parking and keep the proposed cycle lane and pedestrian route clear.
Illustrative streetscape; not a photograph of a study location.08 / COSTS & CONSEQUENCES
I see promise in these proposals, especially Scheme A, but I also see the disruption they could bring.
Before recommending construction, I need to judge whether the improvement would justify the inconvenience people would face along the way.
For the parts of Scheme A that involve a new ramp or an underpass, I would expect lane closures and changes to familiar routes. I would divide the work into shorter sections and keep a clear route for pedestrians and emergency vehicles. Where possible, I would schedule disruptive work outside the busiest hours.
Even with these measures, drivers would have less road space and some people would need longer journeys. Working at night could ease daytime traffic, but nearby residents would then face noise when they need to sleep. I would have to agree a workable schedule with the people affected. I cannot promise construction without congestion or inconvenience.
I need to follow the traffic beyond the point I have redesigned. A diversion could add queues to a residential street, while a faster exit could send more vehicles towards the next junction. I would compare journeys across the surrounding roads before judging whether the change helps.
I would need to check buried services and drainage before estimating the cost of an underpass. I also need to allow for inspections and repairs after it opens. Even the smaller proposals, such as cameras and warning signs, need people to maintain the equipment and act on the information.
In the parking proposals, I would first look at where vehicles park along the roadside, how long they stay, and how this affects access and traffic flow. Some may stop briefly, such as trucks unloading goods for shops or vans delivering parcels. Restricting roadside parking without providing a usable alternative could shift the same problem to the next street. I would observe these parking patterns before deciding where restrictions should apply.
I am less certain about the larger interventions until I can compare their likely benefits with the disruption and cost. I would test smaller changes where possible, then check the results at busy times. If they address enough of the problem, I would reduce the scope of Scheme A. If the evidence points against my original idea, I would revise it.
09 / QUESTIONS TO TAKE FORWARD
I can see what the models suggest, but I cannot claim the road has improved before anything has been built and measured.
Looking back across the four places, these are the questions I would take into the next stage of the work:
I would start where a driver first has to brake or search for a gap, rather than at the visible tail of the queue. At Beihuan, I would compare the joining movement at Entry A with the rightward lane changes approaching Exit E. I want to see whether the exit starts to fill before the mainline slows, or whether a shortage of merging gaps is already holding vehicles at the entrance.
The digital twin lets me stage that sequence and inspect it again with the same demand. It is not evidence that the real road behaves in exactly the same way. I would align the model with time-stamped observations at both connections, then follow the queue upstream to check which event happens first.
I am looking for a change that removes a specific conflict, not simply a drawing with more road space. At Beihuan, the auxiliary lane is intended to give joining and leaving traffic a more distinct path. At Liuxian, the two-way below-grade route separates a through journey from the surface signals. In each case, I would inspect the connection back to the existing road as carefully as the new section itself.
I would compare the existing and proposed arrangements using the same arrivals and route choices. Shorter queues at the redesigned point would be encouraging, but I would also check waiting at the entrance, missed exits and the time needed to complete a journey. The current illustrations explain the intended changes; they do not establish a measured saving.
A clearer route can still end at a queue. Earlier information at Binhai would only help a driver if the alternative route has space and reconnects sensibly. Keeping a curb clear in Bao’an would only solve part of the problem if parking queues or loading activity immediately move to another part of the street.
The larger proposals have the same dependency. An auxiliary lane needs a workable merge at its end, and a tunnel needs surface connections that can receive the traffic leaving it. I would test a busy downstream junction and a blocked alternative route, as well as a favourable case. A proposal that only works under the favourable case would need to be reduced or redesigned.
I would begin with changes that address the observed conflict while leaving daily access workable: clearer advance information, a usable place for short stops, and a continuous route at the road edge.
I have observed these sites on many occasions, but I need more traffic data from different days and times before drawing firmer conclusions. A larger dataset would help me check whether the patterns I have noticed recur and provide a stronger basis for refining my proposals.
I would also like to use more sophisticated analytical methods, more accurate measurements and professional assessment techniques to test and support my conclusions. I do not yet have the knowledge and skills to carry out this work. I hope to revisit the project and address these gaps as I develop the necessary expertise and find opportunities to put it into practice.
10 / EVIDENCE & SOURCES
I keep track of what I have seen, what comes from a source, and what the model has made up for a test.
I separate road records and my observations from the synthetic numbers in the model before I interpret a proposed change.
| Type of material | Main content | Use in the study |
|---|---|---|
| Road and location material | Alignment, entrances, exits, lane positions and changes | Help me locate the site and provide a reference for model making |
| Traffic material | Available flow, speed, queue or journey-time information | Help me understand the peak and choose a test condition |
| Observation records | Photographs, videos and notes actually retained | Let me compare a drawing with something I actually saw |
| Simulation material | Inputs, comparison conditions and results | Show what changes in the test, not what has already happened on the road |
| Reference material | Literature, engineering documents and relevant standards | Help me check whether my assumptions make sense |